Zhonghongyang Architecture: The “Speed-Up Code” for High-Rise Mixed-Use Buildings
Jun 01,2026

It is often said in the construction industry: “Schedule equals profit; quality equals reputation.”
In the construction of high-rise buildings and mixed-use complexes, it is often difficult to simultaneously achieve optimal schedule, cost, and quality. However, the Zhonghongyang architectural aluminum alloy formwork system is challenging this “impossible triangle.”
High-rise construction is all about “speed.”
A Hundred-Meter Tower, Topped Out in a Hundred Days —This is not a slogan; it is the norm for Zhonghongyang’s project delivery.
Adopting an early-removal formwork system, standard-floor construction requires only One layer every 4–5 days, Special projects can even achieve An average of 3.5 days per floor. The first floor is completed in 6–7 days, and the standard floors quickly transition to assembly-line production, maximizing turnover efficiency.

Actual photos of the project’s topping-out ceremony
Integrated construction: “one-time molding” for greater peace of mind.
The complex building envelope features numerous irregular architectural details—bay windows, staircases, bathrooms, and raised sills—requiring extensive custom formwork. Traditional formwork systems often necessitate repeated disassembly and reassembly, which is both time-consuming and labor-intensive.
Zhonghongyang Aluminum Formwork Achieves Irregular structural elements such as walls, beams, slabs, bay windows, and staircases are cast in one go. The concrete is formed to a smooth, even surface, meeting the requirements for no-plastering finish and eliminating one construction step, thereby reducing costs.


Cost accounting—clear and precise
Aluminum formwork can be reused more than 200 times, with average construction costs 15% to 30% lower than those of traditional formwork. Even more importantly, upon decommissioning, the residual value recovery rate is 100%, ensuring that the formwork retains its value right up to the end of its service life.

Easy to install and keeps the job site cleaner.
Each standard panel weighs only 22 kg on average, allowing workers to install and handle it by hand without the need for mechanical assistance. After formwork removal, no construction waste is left on site, making safe, clean, and civilized construction easily achievable.

Floor-mounted
Why are more and more projects choosing Zhonghongyang?
The client has summarized ten reasons, which can ultimately be boiled down to three:
Fast delivery: Template design and manufacturing in 20 days, with delivery within 2 days—zero delays.
Service reality: 521 Service Mechanism: 5-minute response, 2-hour feedback, and problem resolution within 1 day; each project is assigned a dedicated engineer for one-on-one, end-to-end project management.
Strong technical capabilities: No assembly required, easy-to-identify installation, zero design errors, and minimal changes.
High-rise buildings prioritize speed, while mixed-use developments emphasize quality—Zhonghongyang ensures the two are no longer at odds.
From the “100-meter tower topped in 100 days” benchmark of unparalleled efficiency to meticulous cost control that eliminates the need for plastering and crane operations, we don’t just supply formwork—we deliver construction solutions that save you hassle, time, and money on every project.
Other Media Coverage
This Children’s Day, we’re bringing love right to their side.
Jun 01,2026
Zhonghongyang Architecture: The “Speed-Up Code” for High-Rise Mixed-Use Buildings
It is often said in the construction industry: “Schedule equals profit; quality equals reputation.” In the construction of high-rise buildings and mixed-use complexes, it is frequently difficult to simultaneously achieve optimal schedule, cost control, and quality. However, the Zhonghongyang architectural aluminum alloy formwork system is challenging this “impossible triangle.”
Apr 10,2026