Products and Services
The building aluminum alloy formwork system consists of the wall and column formwork system, the beam formwork system, the floor slab formwork system, the external wall joint formwork system, the suspended formwork system, and the accessory system. Formworks are connected by such accessories as pins, pin pieces, and bolts; fastened by back ridges, tie screws, drawing pieces, angle iron, etc.; supported by single top bracing, diagonal bracing, concrete pads, and other bracing pieces; thus composing an organic whole with reliable bearing capacity, stiffness, and stability.
Simple Assembly Deck Formwork - Deckform
Payment: T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy Original Region: China Port Of Dispatch: Shenzhen, China Min Order: Containers Deckform is an advanced aluminum panel prop work system that easily comes to assembly and disassembly
Efficient Wall And Column Formwork
The wall column formwork consists of at least two disposable formwork walls placed opposite each other. The formwork walls are made of pressed metal plates, and the rest are the final poured concrete.
Quick Early-Stripping Slab Formwork - Fastform
Payment method: 30% deposit by wire transfer before manufacturing, and 70% balance to be paid against a copy of the bill of lading. Origin: China Sending Port: Shenzhen, China Minimum order: Container
Payment method: 30% deposit by wire transfer before manufacturing, and 70% balance to be paid against a copy of the bill of lading. Origin: China Sending Port: Shenzhen, China Minimum order: Container Aluminum alloy climbing frames are mainly used in high-rise shear wall structures. It can climb or descend along buildings. It has great development advantages in high-rise buildings.
Aluminum Slab Prop With Scaleplate
Payment :T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy. Original Region :China Port Of Dispatch :Shenzhen,China Min Order :One Container High loading capacity aluminum slab prop with scaleplate are made of aluminum which means they are very light, e.g. the MP350 weighs only 19.40 kg.
Strong Strength Aluminum Shoring Prop
Payment :T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy. Original Region :China Port Of Dispatch :Shenzhen,China Min Order :One Container Aluminum Shoring Prop is getting increased due to not only because of flexibility in the assemble and construction over Prop-Supported Slab Formwork but also the capacity to withstand maximum construction working loads.
Strong Load Rate Steel Shoring Prop
Payment :T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy. Original Region :China Port Of Dispatch :Shenzhen, China Min Order :One Container Steel Shoring Prop is generally used for the construction of heavy structures like Bridges, Culverts, staging of Retaining walls, etc.
Great Strength 10K Steel Shoring Frame
Payment :T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy. Original Region :China Port Of Dispatch :Shenzhen,China Min Order :One Container 10K steel shoring frame is the most universally used frame systems in the industry.